Apparel & garments

Costing in cut-to-pack apparel

How cut-to-pack apparel exporters can find the real cost of every order, from fabric consumption to piece rates, overtime and wastage, instead of discovering losses after shipment.

Fibersoft team21 October 20266 min read
Key takeaways
  • Quote on a planned cost; judge the order on its actual cost.
  • Fabric consumption and wastage are the biggest swings, so measure them per order.
  • Piece rates, overtime and bonuses belong in order costing, not only in payroll.

Planned cost versus actual cost

Every export order starts with a costing sheet: fabric per piece, trims, cutting and stitching rates, washing, packing and overheads. The trouble starts after the order is confirmed. Consumption runs higher, a subcontractor charges extra, overtime is needed to meet the ship date, and nobody sees the real figure until the order is closed.

The cost elements to track per order

ElementHow to capture it
FabricIssue against the order's work order; record actual consumption per size.
Trims & accessoriesIssue by order with a bill of materials.
Cutting & stitchingJob cards per stage with piece rates.
SubcontractingGate passes and vendor bills linked to the order.
Overtime & bonusesFrom attendance and production records.
Wastage & rejectsRecorded at each stage, not estimated at the end.

Job cards and real-time status

Work orders break into job cards for each stage. As bundles are scanned, the order shows how many pieces are cut, stitched, finished and packed, so planners and buyers can see real-time status without phone calls.

Payroll that matches production

When piece rates, overtime and late deductions are calculated from the same scans and attendance, payroll takes hours instead of days and disputes drop. The labour cost then flows into the order's actual cost automatically.

K Industries, a cut-to-pack exporter in Sialkot with around 500 employees, runs production planning, job cards, barcode scanning and payroll this way on Fibersoft ERP.

Frequently asked questions

What is the biggest cost swing in apparel orders?

Usually fabric consumption and wastage, followed by overtime and subcontracting.

How do bundle barcodes help?

Scans at each stage give real-time progress and the same data drives piece-rate wages.

Can we compare planned and actual cost?

Yes. Each order shows its costing sheet against actual issues, wages and charges.

Fibersoft teamERP consultants and ACCA-qualified finance professionals in Gujranwala, implementing Fibersoft ERP across Pakistan.
See it with your own data

We'll show this workflow in Fibersoft ERP with items and reports from your business.

Book A Demo
Demo pass

See Fibersoft run your process

Book a free Zoom demo for your industry, or ask the AI assistant anything right now.

FROMSpreadsheets & basic software
TOFibersoft ERP
VIAZoom
CLASS1st class ERP
GATEYour industry
MODULES37
BoardingFree demo
Book a demo
↑↓ navigate↵ openCtrlK search anywherePopular