- Cost every job on a job card: material, ink, adhesive, plates or cylinders, machine time and wastage.
- Record actual wastage by process, not a flat percentage.
- Compare quoted and actual cost after every job.
Where the margin goes
A packaging job passes through extrusion or sheet cutting, printing, lamination, slitting or die-cutting, and pouch making or gluing. Each process consumes material and machine time and creates wastage. If cost is estimated as 'film plus a percentage', some jobs quietly lose money.
The job card
| Cost element | How it is captured |
|---|---|
| Film, board and paper | Issued roll-wise or sheet-wise against the job |
| Ink and adhesive | Issued by weight per job |
| Cylinders, plates and dies | Charged to the job or spread over repeat orders |
| Machine time | Hours per process at the machine's hourly rate |
| Wastage | Recorded per process: setup, printing, slitting |
From quote to actual
- Quote from a costing template with expected wastage.
- Convert the approved quote into a job card and work orders.
- Issue materials and book output and wastage per process.
- Close the job: actual cost per kg or per 1,000 pieces appears.
Master Plastic Pack uses Fibersoft ERP for flexible packaging, D-boxes and sheets, with one record from order to dispatch.
Frequently asked questions
Can wastage be recorded per process?
Yes. Setup, printing, lamination and slitting wastage can be booked separately on each job.
Are cylinder and plate costs included?
Yes. They can be charged to a job or spread over repeat orders.
Can I compare quoted and actual cost?
Yes. A report compares the quote with the actual job cost after closing.
We'll show this workflow in Fibersoft ERP with items and reports from your business.