- Track films by roll, micron, width and weight, not by total kilograms.
- Capture wastage at printing, lamination and slitting separately.
- Plan by machine capacity to promise realistic delivery dates.
Why kilograms alone mislead
A store that shows 12 tonnes of film may still not have the 40-micron, 900 mm roll a job needs. Converters need stock by roll, with micron, width, weight and batch, so planners can pick the right material and use part-rolls before they are forgotten.
Follow the job through each stage
- Printing: issue film and ink rolls; record output weight and wastage.
- Lamination: issue printed rolls and adhesive; record bonded output.
- Slitting: convert jumbo rolls into customer widths; record trim loss.
- Packing: label rolls or cartons with barcodes and weights.
- Dispatch: scan onto the delivery note against the order.
Capacity and dispatch
Printers, laminators and slitters set the real delivery date. Planning jobs against machine capacity, with maintenance schedules in the same system, gives sales a date they can promise and makes late dispatches visible early.
Master Plastic Pack, a flexible packaging, D-box and sheet manufacturer, manages films, adhesives, inks, printing, lamination, slitting, packing and dispatch on Fibersoft ERP.
Frequently asked questions
Why track films by roll?
Jobs need a specific micron and width; roll-wise stock shows exactly what is available.
Where should wastage be recorded?
At each stage: printing, lamination and slitting, so it can be fixed.
Can delivery dates follow machine capacity?
Yes. Jobs are planned against printer, laminator and slitter capacity.
We'll show this workflow in Fibersoft ERP with items and reports from your business.